cGMP manufacturing

Expanding footprint from contract development to manufacturing with solid oral dose forms. 

Green field manufacturing facility for the finished dosage is scheduled to be fully operational by 2021.

Facility is designed to meet the highest regulatory and safety standards ensuring upkeep of production personnel and the environment and thereby maintaining the integrity of product manufacturing. A proven management system, engineering controls, occupational health pre-planning and protective equipment for a wide range of products and safety classifications are already in place.

Copyrights © 2020 V-Ensure.com